|
Tsing Sha Highway (Chinese: 青沙公路) is a major expressway in Hong Kong, which links the island of Tsing Yi to Sha Tin. The road is part of Route 8, which starts in Sha Tin and terminates in Tung Chung. It was opened in March 2008 and extended in December 2009. ==History== Tsing Sha Highway was built in three stages. The section that is known as Route T3 is in Tai Wai. The contract was awarded on 16 March 2003 and construction commenced on 26 March 2003.〔(【引用サイトリンク】publisher=Hong Kong Engineering Archive )〕 The southbound bridge was completed on 23 November 2005, and the northbound bridge in March 2008.〔〔(【引用サイトリンク】accessdate=19 May 2013 )〕 This section cost approximately HK$2,120.2 million to build.〔 This section has two exits; 1 and 1A. The section between the end of Road T3 and Stonecutters Island commenced construction in November 2002 and was opened on 21 March 2008.〔(【引用サイトリンク】title=Route 8 between Cheung Sha Wan and Sha Tin )〕 It includes the Tai Wai Tunnel, the Sha Tin Heights Tunnel and the Eagle's Nest Tunnel. This section has five exits; 1B, 1C, 2A, 2B and 2C. The section between Stonecutters Island and Tsing Yi commenced construction in April 2002 and was opened on 20 December 2009.〔(【引用サイトリンク】title=Route 8 between Tsing Yi and Cheung Sha Wan )〕 It includes the Stonecutters Bridge and the Nam Wan Tunnel. This section has three exits; 2D, 3 and 3A. Before this section was completed, all cars continuing with Tsing Sha Highway have taken exit 2C and so those cars who wish to go to Lantau should use exit 2A. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Tsing Sha Highway」の詳細全文を読む スポンサード リンク
|